top of page

A post from our friends at TENON engineering

Present and correct for assembly…



Here's an example of patterns frequently seen in the manufacturing industry for those who take the time to notice. They can be mesmerising, such as these assembly trays picked by our reliable stores team and ready for building the Wallace Instruments’ P14 Plasimeter.


We thought it was worth doing a slideshow of some of the trays before they are devoid of parts as they do not stay full for long once the assembly team starts building the sub-assemblies. This is a fine representation of how TENON Engineering organises the safe supply and handling of both manufactured and purchased components.


The planning and effort that Tenon Engineering invests in component protection ensure safe and successful outcomes for our clients' products. Connect with us to see how our dedication can benefit your projects.




Commentaires


bottom of page